Skip to content
  • About
    • About ERIAS
    • Meet the team
  • Services
    • Permitting, Approvals & Compliance
    • Communities and Social Performance
    • Environmental and Social Impact Assessment
    • Terrestrial and Aquatic Ecology
    • Permitting, Approvals & Compliance
    • Communities and Social Performance
    • Environmental and Social Impact Assessment
    • Terrestrial and Aquatic Ecology
    • Marine Sciences
    • Surface & Groundwater
    • Climate Services
    • Decommissioning, Closure and Rehabilitation
    • Marine Sciences
    • Surface & Groundwater
    • Climate Services
    • Decommissioning, Closure and Rehabilitation
    • Geospatial Services
    • Metocean
    • Ecological Risk Assessment
    • Environmental Management
    • Geospatial Services
    • Metocean
    • Ecological Risk Assessment
    • Environmental Management
  • Projects
    • All Projects
    • PNG Projects
  • News
  • Contact Us

Fountain Head Gold Project Approvals

  • Australia
  • Mining
  • Services: Environmental and Social Management, Planning and Permitting, Surface and Groundwater Investigations, Terrestrial and Aquatic Ecology

PNX Metals Limited (PNX) is proposing to develop the Fountain Head Gold Project located approximately 170 km south of Darwin. The project is located on pastoral land at a site that has previously been mined and has been under ‘care and maintenance’ since 2008.

ERIAS was engaged by PNX to lead the project environmental and social impact assessment and prepare relevant documentation to support project assessment by the Northern Territory Environmental Protection Authority (NT EPA).

ERIAS’ coordinated baseline and impact assessment modelling studies including surface water, groundwater, geochemical, cultural heritage, air quality, noise, traffic and transport, and terrestrial flora and fauna. ERIAS personnel undertook aquatic ecology surveys at the site, including water quality assessment and a social impact assessment in accordance with NT EPA guidelines.

ERIAS prepared a notice of intent (NOI) and subsequently an environmental impact statement (EIS), including a supporting Mine Closure Plan and Water Management Plan. ERIAS also provided advice and support for PNX’s stakeholder engagement activities.

Fountain Head Gold Project Approvals

Previous Papua LNG Project
© ERIAS Group Pty Ltd 2026 ABN 28 155 087 362
Website: Digital Evolution