Skip to content
Erias - celebrating 10 years
  • About
    • About ERIAS
    • Meet the team
  • Services
    • Planning and Permitting
    • Social Impact and Corporate Sustainability
    • Environmental and Social Management
    Menu
    • Planning and Permitting
    • Social Impact and Corporate Sustainability
    • Environmental and Social Management
    • Terrestrial and Aquatic Ecology
    • Marine Sciences
    • Surface and Groundwater Investigations
    Menu
    • Terrestrial and Aquatic Ecology
    • Marine Sciences
    • Surface and Groundwater Investigations
    • Climate Change and GHG Emissions
    • Decommissioning, Closure and Rehabilitation
    • Geospatial Services
    Menu
    • Climate Change and GHG Emissions
    • Decommissioning, Closure and Rehabilitation
    • Geospatial Services
  • Projects
    • All Projects
    • PNG Projects
  • News
  • Contact Us
Search
Close
Erias - celebrating 10 years
Search
Close
Erias - celebrating 10 years
Search
Close

Papua LNG Project

  • Papua New Guinea
  • Oil and Gas
  • Services: Environmental and Social Management, Geospatial Services, Marine Sciences, Planning and Permitting, Surface and Groundwater Investigations, Terrestrial and Aquatic Ecology

ERIAS was engaged by French company, Total E&P PNG Limited, as the lead environmental consultant on the Papua LNG Project. The project comprises the production and processing of gas and condensate from the Elk-Antelope field in Gulf Province, transporting it via a pipeline overland and then offshore in the Gulf of Papua to the existing PNG LNG producing and exporting facility in Caution Bay, Papua New Guinea (PNG).

Our work included undertaking initial screening and risk assessment to inform pipeline alignment and LNG plant location, regulatory compliance mapping and comprehensive social and environmental baseline studies, which included:

Oipu stakeholder consultation
  • Geology, terrain and soils.
  • Surface water and sediment quality.
  • Seabed and coastal geomorphology.
  • Aquatic (freshwater and marine) and terrestrial biodiversity.
  • Vegetation mapping.
  • Land and natural resource use.
  • Community health.
  • Governance and economics.
  • Noise and air quality.
  • Cultural heritage and archaeology.
  • Marine and river traffic.
  • Community and household surveys.

ERIAS also led the environmental assessment process and early stakeholder engagement, which was aligned with International Finance Corporation (IFC) performance standards. This process involved the preparation of an environmental inception report (EIR), a stakeholder engagement plan (SEP), an environmental impact statement (EIS) and a detailed construction environmental and social management plan (CESMP).

The project involved the coordination of a team exceeding 100 people, 30 subcontractors, 434 field days and teams in France, PNG, Canada and Australia. The project was completed over a 4.5-year period. The EIS was accepted by CEPA in early 2020.