Skip to content
Erias - celebrating 10 years
  • About
    • About ERIAS
    • Meet the team
  • Services
    • Planning and Permitting
    • Social Impact and Corporate Sustainability
    • Environmental and Social Management
    Menu
    • Planning and Permitting
    • Social Impact and Corporate Sustainability
    • Environmental and Social Management
    • Terrestrial and Aquatic Ecology
    • Marine Sciences
    • Surface and Groundwater Investigations
    Menu
    • Terrestrial and Aquatic Ecology
    • Marine Sciences
    • Surface and Groundwater Investigations
    • Climate Change and GHG Emissions
    • Decommissioning, Closure and Rehabilitation
    • Geospatial Services
    Menu
    • Climate Change and GHG Emissions
    • Decommissioning, Closure and Rehabilitation
    • Geospatial Services
  • Projects
    • All Projects
    • PNG Projects
  • News
  • Contact Us
Search
Close
Erias - celebrating 10 years
Search
Close
Erias - celebrating 10 years
Search
Close

Surface and Groundwater Investigations

ERIAS’ scientists have been undertaking baseline characterisation, impact assessment and monitoring of streams, off-river waterbodies, lakes and groundwater for over 25 years.

Our surface and groundwater investigation services include:

  • Stream gauging and meteorological station installation
  • Hydrological modelling
  • Sediment transport modelling
  • Water and sediment quality baseline studies and monitoring programs
  • Aquatic flora and fauna surveys
  • Aquatic habitat characterisation
  • Assessment of risk of acidic and metalliferous drainage (AMD) from mine materials
  • Modelling impacts of discharges on receiving water quality
Get in touch
Fountain Head Gold Project Approvals

Fountain Head Gold Project Approvals

PNX Metals Limited (PNX) is proposing to develop the Fountain Head Gold Project located approximately 170 km south of Darwin. The project is located on pastoral land at a site that has previously been mined and has been under ‘care and maintenance’ since 2008.

Read more
Papua LNG Project

Papua LNG Project

ERIAS was the lead environmental consultant on the Papua LNG Project, which incorporated social and environmental baseline surveys, impact assessment modelling and the development of a Level 3 EIS and ESHIA .

Read more
TWM Integrated Waste Management Facility Expansion

TWM Integrated Waste Management Facility Expansion

In 2020 ERIAS was engaged by Total Waste Management (TWM) to undertake environmental and social baseline studies and an environmental impact statement (EIS) to support a Level 3 environment permit for the expansion of their integrated waste management facility in Roku, approximately 20 km from Port Moresby.

Read more
All Services
Climate Change

Got a question?

Get in touch

© ERIAS Group Pty Ltd 2021 ABN 28 155 087 362

Website: Digital Evolution